Monday, 18 Nov 2024

Rail Network Set for Comprehensive Upgrades During Christmas and New Year Period

With the festive season approaching, passengers are advised to prepare for widespread railway upgrades planned over the Christmas and New Year period, as extensive engineering efforts are set to disrupt some travel routes. Over this time, crews will be engaged in a host of critical projects including the replacement or refurbishment of 45 sets of railway points, four bridge reconstructions, the laying of 40 kilometers of new signaling cables, updates to 17 level crossings, and the activation of seven new signaling systems. These improvements are designed to enhance train punctuality, performance, and overall reliability.


Rail Network Set for Comprehensive Upgrades During Christmas and New Year Period
1.5 k views

With the festive season approaching, passengers are advised to prepare for widespread railway upgrades planned over the Christmas and New Year period, as extensive engineering efforts are set to disrupt some travel routes. Over this time, crews will be engaged in a host of critical projects including the replacement or refurbishment of 45 sets of railway points, four bridge reconstructions, the laying of 40 kilometers of new signaling cables, updates to 17 level crossings, and the activation of seven new signaling systems. These improvements are designed to enhance train punctuality, performance, and overall reliability.

Significant closures at London Liverpool Street for refurbishments and passenger enhancements, with the station shuttered from Christmas Day to January 2. Greater Anglia and Stansted Express routes will be rerouted through Stratford, and London Overground will halt at London Fields. Alternative travel options include the Victoria line from Walthamstow Central and Seven Sisters, or local buses.

On the Midland Main Line, works to accommodate East Midlands Railways' new fleet will disrupt services from December 21 to 29. No trains will operate between London St Pancras and Bedford, and Thameslink will bypass the stretch from St Pancras to Harpenden. Travellers northbound from St Pancras should plan to use alternative London terminals and connecting bus services.

At London Paddington, preparatory installations for new signaling and track equipment essential for HS2 connections at the forthcoming Old Oak Common station will halt all services calling at the station from December 27 to 29. Diversions will redirect most trains to and from London Euston, with key stops at Reading and Ealing Broadway, where passengers can transfer to London-bound Tube services.

In Crewe, extensive resignalling efforts from Christmas Day through January 2 will lead to varied service changes, including a full suspension on December 27 and altered services to Liverpool and Manchester until January 3.

you may also like

Hot travel trend has people hunting for vintage treasures on vacation
  • by foxnews
  • descember 09, 2016
Hot travel trend has people hunting for vintage treasures on vacation

Booking.com has released its annual travel predictions list for 2025, and one trend, "vintage voyaging," has 74% of travelers seeking vintage or second-hand items.

read more